国产自慰在线资源|国产精品亚洲中文欧美|亚洲欧美日韩精品专区|在线免费国产视频一区二区|免费一级A级高清毛片人妻|亚洲欧美在线制服丝袜国产|伊人久久大杳蕉夜夜揉夜夜爽|最新哺乳亚洲AV日韩AV二区

EPC Products Civil Engineering Testing Instruments Geotechnical Testing Pile Testing Piles Quality Control Pile Capacity High Strain Testing Top Force Transducer
產(chǎn)品中心
Top Force Transducer

Model:TOP TRANSDUCER

Use:Top force transducer method eliminates concrete build up or excavation on drilled concrete piles.

Standard:



Top Force Transducers for use with the Pile Dynamics Analyzer-Dynamic Load Tester (PDA-DLT) and the Pile Driving Analyzer (PDA), available in three sizes:

  • 91 cm (36″) – 4,000 tons (includes 8 strains)
  • 61 cm (24″) – 2,400 tons (includes 8 strains)
  • 41 cm (16″) – 1,150 tons (includes 8 strains)


Top force transducer method eliminates concrete build up or excavation on drilled concrete piles. Using Pile Dynamics, Inc’s Top Force Transducer allows for quick set up. When used with the Pile Dynamics Analyzer – Dynamic Load Tester (PDA-DLT), the Top Force Transducer improves force accuracy and reduces labor costs. Force measurements may be taken via bolted on gages, load cell, dolly, or from ram measurements.

Advantages Include:
? No “windows” in casting provide more accurate force
? Area and modulus are identifiable
? Less pile preparation required
? Eliminates excavations
? Accelerometers mounted near top of pile, no longer requiring two diameter distance
? Eliminates errors due to bending


Project Case
Solution
Download
相關(guān)標(biāo)簽
PDI,Pile Dynamics